A pumping station will be installed in Sevastopol on the water surface

November 20, 2020

The Russian Ministry of Defense announced that in the occupied Crimea, in Sevastopol, a pumping station will be installed on the water surface at the deepest point of the Kadykov quarry. This was reported by the Russian media agency TASS.

“The station will be installed on the water surface at the deepest point of the Kadykov quarry, which will be able to lift 15 thousand cubic meters of water to a design height of 105 meters per day”,- the message said.

It is noted that this pumping station will become an important link in this water pipeline from the Kadykov quarry to the Chorna river with a length of 10 kilometers. Further, the water will go to the city water intake points.